LLC "Inacap" specializes in the production, delivery and installation of switchboard equipment across the territory of Minsk and Minsk region. The list of services included work on the electrification of apartments, houses, offices, commercial and other facilities.
PE "prajjd KOMPANI" was created in 2012 and since day one the company team started working on responsible sites of the city of Minsk and the Minsk region, such as the construction of metalloproizvoditelej case street Engineering and reconstruction of the administrative building on the street Orel, and others.
At the end of 2013 in connection with the construction and installation works on substations TP-and TP 1178-1227 was created commissioning phase and recruited qualified professionals.
We have experience in electric installation and commissioning works on objects of high level of complexity and medium.
As a part of our team are craftsmen and foremen trained in Mapkapk BNTU and certification in RUE "Belstroytsentr".
PE "pride company" successfully operates the quality management system and the system of organization of labor protection on production.
Today we are a diversified electrical company offering its customers:
The complex of works on the objects of civil construction.
The complex of works on objects of industrial construction.
The complex of works in substations of various types.
Design of automatic control system based on programmable logic controllers and sensors from leading manufacturers.
Running the automated workplace of the operator.
CPAP ‘electrical System‘ provides the following services:
- electrical work;
- installation of low voltage lines and systems;
- installation of systems of electric heating;
- laying of cable lines and systems;
- commissioning works;
- installation of TP and KTP;
- Assembly of switchboard equipment.
Installation of outlets/switches, {external/hidden}: 3-5
Install power sockets/switches: 8-11
Removal of old sockets and switches/power: 2-3
Preparation of holes for sockets/dis.box(open.+podroz.):4-7
Installation junction box connection: 14-18
Link installation G. S. BL./brick./well.b.wall (1.5x1.5)(M. p.): 2-3
Putty grooves (M. p.): 1,5
Cable laying stroebe (M. p.): 1
Mounting boxes PVC up to 50mm/50mm: 2-3
The installation spot lamp /SMD lamp, chandelier: 6-11
Dismantling spot lamp /SMD lamp, chandelier: 3-4
Installation and connection of the machine, ouzo, differential: 7
Installation/transfer of the meter from 30
Preparing niche under flap: 25
Installation shield: 20